Wednesday, September 23, 2009

GCI's King Air

Gospel Carrier International's Super King Air 200 is in Hangar C to undergo phase inspections #3 & 4. The King Air is one of the larger and more complex aircraft we regularly work on. It's always a big job, using multiple personnel, to work through the in-depth inspection process required to ensure the aircraft's ongoing airworthiness.

The King Air in Hangar C.

Ian maintains the left engine.

Chuck works on the nose gear steering system.

Josh, Andy, & Paul refer to the manuals as a regular part of the King Air inspection.

Josh & Andy install the right main gear strut after disassembly, inspection and repair.

The King Air will be with us through next week.

No comments: