Actually the spar cap inspection is completed. The spar passed the inspection and now the guys are working to prepare the 402's airframe for installation the FAA-mandated spar cap modification. Here's a short clip of Mike removing some aluminum skin from the left engine nacelle as part of the overall inspection/repair/modification process.
No comments:
Post a Comment