We currently have seven mission and non-mission projects underway: mission--Mooney annual inspection for MAF, Cessna 206 restoration for ministry in Brazil, annual inspection/double engine overhaul on a Cessna 337 for ministry in Canada, a Cessna 402 in for spar cap inspection, and Cessna 172 that's being repaired and painted for use by MMS. On the non-mission front: inspection and repair of a local RV-8, and an annual inspection of a regional Cherokee.
Here are some snapshots of the action.
No comments:
Post a Comment